NCA Opening Year 2026
$26,785.12
Raised
58
Donations
$1,005,000
Goal
An additional $444,727 has been raised off-line from 38 additional donors.
With the hire of a Head of School and the building purchase secured, we will begin Phase I of renovations in early 2026. A historic school built in 1864 with a 1962 addition, the school has great bones – wood floors, high ceilings, blackboards, expansive windows and even a huge steel fire door.
Phase I involves renovation of the 1962 era classrooms – four classrooms on the upper level and three classrooms on the lower level; renovating the common area and offices; and gutting the kitchen with the intention of building out a teaching kitchen later. The east side of the main lobby will be bumped out 20 feet for a new entry from the north, making space for a reception area. Extensive use of glass will allow for greater security. Our renovations will preserve the past while refurbishing for the needs of the future.
If you would like to donate by check, please send to:
Payable to: NCA
c/o Cheryle Rebholz
11715 N. Bridgewater Dr.
Mequon, WI 53092
NCA is a 501(c)(3) non-profit. EIN: 87-4684700
All donations are tax-deductible.